Supply and installation of monitoring equipment, measurements on the front, measurements and data returns
Underground excavation | 1.700.872 m³ |
---|---|
Geological surveys of excavation faces | 8358 |
Convergence sections | 718 |
Instrumented sections | 30 |
Inclinometer columns | 80 |
Piezometers | 80 |
Target | 560 |
The motorway section is part of the transport corridor n. 5 of the Trans-European Networks (TEN). The main works to be carried out consist of 5 viaducts, for a total length of 2.5 km, and a double-tube tunnel of 7.5 km in length.
The tunnel, which will become the longest in Slovakia, is part of the new Lietavska Lucka - Visnove - Dubna Skala section of 13.5 of the D1 motorway, which in turn is part of Corridor No. 5 of the TEN network linking Bratislava with Uzhorod in Ukraine and is funded by the Slovak government and the EU.