  • 10-10-2015
  • 01-05-2015
    FIELD has achieved a Contract regarding Supply, Installation and Data Management (WMS) of the Geotechnical and Structural Monitoring System in the new High Speed Railways Torino-Lione - Lot Saint Martin La Porte
  • 01-04-2015
    FIELD has achieved a Contract regarding Supply and Installation of gauges, Topographical Activities, Drillings, Geotechnical and Geomechanical Investigation and Data Management (WMS) of the Višnové new highway tunnel (Slovakia)
  • 01-02-2015
    FIELD has achieved a Contract regarding SW Data Management (WMS) of the new Riyadh Line Package 3 Lines 4, 5 & 6 (KSA)
  • 01-01-2015
    FIELD has achieved a Contract relating to the supply, installation and data management with our WMS of a complex Static, dynamic and topographical monitoring system of 6 buildings adjacent to the workings site of the Bisagno River in Genova (Italy)
  • 30-09-2014
    Field acquire the contract, for the data management with WMS of the third Bosphorus Bridge, Istanbul
  • 01-09-2014
    Field acquired the contract, for design, supply, installation and data management (WMS) of railway platform monitoring system, with RDS and automatic Topographical stations in the construction site in Forlanini street (MI)
  • 11-07-2014
    Field performed Well Logs tests at the metro construction site in Riyadh - Saudi Arabia
  • 01-07-2014
    Field acquired the contract, for theperformance of tests PDI on the buildinsite LNG Project - Angola
  • 01-07-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the damOjo de Agua - Honduras
  • 28-04-2014
  • 15-04-2014
    Field performed Well Logs tests at the metro construction site in Doha-Qatar
  • 01-04-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the dam Cerro del Águila - Perù
  • 01-03-2014
    Field acquired the contract, concerning the supply and installation of instruments for walls monitoring and the execution of topographic control measurements at the building site of Porta Nuova Garibaldi Hotel-F (MI)
  • 10-01-2014
    Field acquired the contract, for the supply and installation of vibrating wire extensometers in the piles cages and the next load test for the building site of TEEM Lot B
  • 24-10-2013
    Field Srl contributed with their own systems of monitoring in the project to removal of the Costa Concordia
  • 01-10-2013
    Field has performed the tests of Viaducts 2, 2a, 3, 5.1, 5.2 and 6, and 2 of the Gallery of the new SS64 Porrettana
  • 01-08-2013
    Field acquired the contract, for the supply and installation of equipment for monitoring civilian works of the viaduct Serio and Oglio for the new High Speed ??- CEPAV 2
  • 01-08-2013
    Field acquired the contract, for the supply, installation and management of data instrumentation for structural monitoring of the new car park of St. Giusto - Trieste
  • 23-07-2013
  • 06-04-2013
    Field has acquired the contract for the supply and installation of geotechnical instrumentation for monitoring in the town of Acicastello (CT)
  • 03-04-2013
  • 21-02-2013
  • 21-02-2013
  • 14-02-2013
    Field is performing the installation of a control system for structural monitoring with manual and automatic reading system for the construction of the new underground car park on the harbor of Nice (France)
  • 14-01-2013
    Field has acquired the contract for the supply and installation of a system for remote monitoring data of dams Giacopiane - Pian Sapejo - Osiglietta
  • 01-11-2012
    Field participates through its monitoring systems and data management to recovery operations of the cruise ship Costa Concordia
  • 01-10-2012
    Field has acquired the contract for the execution of No.10 static load tests on the foundation piles for the new Mosque of Algiers-Algeria
  • 01-10-2012
    Field has acquired the contract for the supply, installation and management of data on our web portal WMS, inherent  the system of monitoring of the buildings adjacent to the Torrent Chiaravagna - Genoa
  • 01-07-2012
    Field acquired the contract for the execution of a system for elevation monitoring of the surface of the tract for the new line is MM5 - Milan
  • 01-03-2012
  • 01-03-2012
    Field acquired the contract, concerning the restoration and maintenance of the monitoring system of dam Castreccioni - Macerata
  • 01-02-2012
    Field acquired the contract, for the supply and installation of instrumentation for geological and structural monitoring including the data management with our system WMS of the Viaduct Fornace
  • 01-02-2012
    Field acquired the contract, for the design of monitoring system of the tracks of the Milan Metro Line 2, in the section between the stations Gessateand farm Antoinette.
  • 01-01-2012
    Field acquired the contract on, concerning the supply and installation of an automatic monitoring system at the viaduct "Micheletti 2"
  • 01-10-2011
    Consortium of Metro Line 1 of Panama, Field by the company owned Monitoriza S.A. has acquired the contract for the supply, installation, measurement and data management through our WMS of the new Line 1 of Panama City
  • 11-07-2011
    Field s through the company Monitoriza SA, acquired the order for Quimbo Dam (Colombia) for the design, supply and installation of geotechnical and structural instrumentation
  • 23-03-2011
  • 10-12-2010
    Field works with Impregilo for monitoring Hidrosogamoso dam (Colombia)
 
 
 
portfolio
YEAR2015
CUSTOMERZARA EXPO 1B SCARL
PROJECTZARA EXPO
ACTIVITYMonitoring system of twist with RDS and longitudinal level with robotic total station of 10 rail tracks affected by the works of pushing two monoliths
YEAR2015
CUSTOMERF.I.S. IMPIANTI INTERRATI S.r.l.
PROJECTRESTORATION GALLERY BETWEEN RAILWAY STATION PIOLA AND LAMBRATE M2 - MILAN
ACTIVITYMonitorin sytem installation anda WMS data management
YEAR2015
CUSTOMERSirtecnigi - Gazprom
PROJECTGas Treatment Plant
ACTIVITYStress monitoring system installation on the pipes in Gas Plant
YEAR2015
CUSTOMERSalini Impregilo
PROJECTCONSTRUCTION OF MOTORWAY D1 LIETAVSKÁ LÚCKA – VIŠNOVÉ – DUBNÁ SKALA
ACTIVITYSupply, installation and data management of seismic and geotechnical monitoring system tunnels of Višnové
YEAR2014-2015
CUSTOMERConsorzio Stabile per le Infrastrutture
PROJECTBisagno Creek
ACTIVITYInstallation of Number 6 monitoring systems for automatic control of 6 neighboring buildings to work for the functional recovery of the final stretch of the creek Bisagno
YEAR2014-2015
CUSTOMERConsorzio CEPAV2
PROJECTHS Milan-Venice
ACTIVITYInstallation of monitoring system of the civil works of viaducts Serio, Oglio and St. Martin of the tract Treviglio-Brescia
YEAR2014
CUSTOMERMaltauro
PROJECTProject Vie d'Acqua - Via D'acqua Sud - Channel and Dock connection - Expo/Fiera
ACTIVITYPose in work of RDS monitoring system and robotic total station for the relief of four railway tracks of the Turin-Milan
YEAR2014
CUSTOMERMetro Blu
PROJECTLine 4 Underground Milan
ACTIVITYDesign, supply, installation and data management of monitorin system of railwai platform in Forlanini street
YEAR2014
CUSTOMERGazprom
PROJECTGas Treatment Plant
ACTIVITYPiping stress monitoring system - Gas Treatment Plant - Kazatchiya - RUSSIA
YEAR2013-2014-2015
CUSTOMERELEM Macedonia Power Planes
PROJECTGlobocica, Tikves, Spilje, Sveta Petka, Kozjak and Mavrovo Dams
ACTIVITYTechnical assistance for the installation of new instrumentation for monitoring and restoration of the existing system
YEAR2013-2014
CUSTOMERCEPAV 2
PROJECTHS Line Milan-Venice
ACTIVITYSupply and installation of monitoring systems OO.CC high-speed line
YEAR2012
CUSTOMERSELC SOC. COOP
PROJECTNaval dockyard of Venice
ACTIVITYInstallation and data management system for monitoring of the basin no. 3
YEAR2012
CUSTOMERSISGEO
PROJECTMakedonia's Dams
ACTIVITYInstallation and restoring of monitoring systems of dams Mavrovo, Globocica, Spilje and Tikves
YEAR2012
CUSTOMERPENTAPOLI SCARL
PROJECTThird lane expanding A14-Fano Pesaro
ACTIVITYSupply and installation of monitoring system natural gallery GN01
YEAR2012
CUSTOMERSTE PIZZAROTTI ET CIE
PROJECTPARKING FOR THE PORT OF DOGANA
ACTIVITYSupply, installation and data management of Monitoring System
YEAR2012
CUSTOMERMADNI ENGINEERING CONSTRUCTION
PROJECTKOTRI BARRAGE
ACTIVITYTechnical assistance for installation of the monitoring system of Kotri Barrage - Pakistan
YEAR2012
CUSTOMERGESPAR SPA
PROJECTNew car park Parma
ACTIVITYSupply, installation and rental and static and dynamic monitoring system
YEAR2012
CUSTOMERISK TRANSEXPO
PROJECTLviv Stadium Euro 2012
ACTIVITYTechnical assistance for installation of the monitoring system of the new stadium
YEAR2012
CUSTOMERMARCHESI ANTINORI S.R.L.
PROJECTEnological cantina in locations BARGINO (FI)
ACTIVITYSupply and installation of instrumentation for geotechnical monitoring and web data management service
YEAR2012
CUSTOMERILSET & ESOSTRADE
PROJECTTorrent Chiaravagna - Genoa
ACTIVITYSupply, installation and data management of the monitoring system of the buildings surrounding the torrent Chiaravagna - Genoa
YEAR2012
CUSTOMERUTE
PROJECTLine 1 Uderground Panama
ACTIVITYSupply, installation and web data management of monitoring system of new undergound line 1 of Panama City
YEAR2012
CUSTOMERPETKA DAM RIKO
PROJECTPetka Dam
ACTIVITYTechnical assistance for installation of the monitoring system of Petka dam - Makedonia
YEAR2012
CUSTOMERIMPRESA DI COSTRUZIONI CARENA
PROJECTViaduct Fornace
ACTIVITYSupply and installation of instrumentation for geological and structural monitoring including the data management with our system WMS
YEAR2012
CUSTOMERIMPREGILO
PROJECTHidrosogamoso Dam
ACTIVITYSupply an installation of monitoring system of Hidrosogamoso Dam - Sogamoso (Colombia)
YEAR2011
CUSTOMERCOOPSETTE
PROJECTSS 64 Porretana (BO)
ACTIVITYMonitoring system installation for the control of landslide movements
YEAR2011
CUSTOMERMurray & Roberts Cementation LTD
PROJECTGautrain Park Station to Shaft E2 - Johannesburg (SA)
ACTIVITYMonitoring System installation
YEAR2011
CUSTOMERGABBA 1
PROJECTNew car park in Via Gabba (MI)
ACTIVITYInstallation and data management of monitoring system of the building near the working site
YEAR2011
CUSTOMERGABI SHOEF LTD
PROJECTHeichal Hatarbut Mann Auditorium Tell Aviv
ACTIVITYMonitoring system installation for the control of differential settlement
YEAR2011
CUSTOMERINTERCANTIERI SPA
PROJECTNew car park De Lellis street (VR)
ACTIVITYInstallation and data management of monitoring system of the building near the working site
YEAR2011
CUSTOMERIMPRESA GENERALI GELA
PROJECTViaduct "Geremia 2" Gela - Sicily
ACTIVITYSupply and installation of an automatic monitoring system
YEAR2011
CUSTOMERPDR DE REGE S.p.A.
PROJECTNew parish complex - Rapallo (GE)
ACTIVITYSupply and installation of monitoring system of the buildings surrounding the excavation
YEAR2011
CUSTOMERS.M.A. Sistemazioni Meteorologiche Ambientali S.p.A.
PROJECTLandslide in Miglionico (MT)
ACTIVITYMonitoring system installation for the control of lanslide movements
YEAR2010-2011
CUSTOMERPENTAPOLI SCARL
PROJECTExtension of the third lane highway A14
ACTIVITYSupply and installation of monitoring equipment
YEAR2010-11
CUSTOMERSOC. CLODIA ARL
PROJECTMockup
ACTIVITYRealization monitoring system
YEAR2010
CUSTOMERCONS.FER.
PROJECTMetallic Bridge Road on river PO-Piacenza
ACTIVITYInstalling gauges to vibrating string on the bridge deck beams and inclinometers biaxial on batteries of viaduct
YEAR2010
CUSTOMERCattolica Scarl
PROJECTNew railway gallery line Pesaro Cattolica
ACTIVITYInstallation of monitoring sections of new railway tunnel
YEAR2010
CUSTOMERAlpTransit
PROJECTTunnel Ceneri
ACTIVITYMonitoring System
YEAR2010
CUSTOMERRFI
PROJECTPetaciatto landslide
ACTIVITYReinstate monitoring system
YEAR2010
CUSTOMEREUROTECH SRL
PROJECTHarbor - Tripoli - Libya
ACTIVITYMonitoring System breakwater
YEAR2010
CUSTOMEREVERGREEN TIRANA
PROJECTSkyscraper
ACTIVITYMonitoring System
YEAR2010
CUSTOMERFABBICATO STAZIONE DI PARMA - BONATTI
PROJECTParma train station
ACTIVITYMonitoring System
YEAR2010
CUSTOMERSaipem Rete Gas
PROJECTPipeline Galliano Castelferrato-Sparacollo
ACTIVITYInstalling monitoring system with micro weld gauges
YEAR2009-2010
CUSTOMERGarbi Linea 5 Scarl
PROJECTMM2 Station
ACTIVITYUnderground Station Monitoring System
YEAR2009-2010
CUSTOMERCEPAV 1 (assegnatari)
PROJECTAV MI-BO
ACTIVITYInstallation and Test UAD
YEAR2009-2010
CUSTOMERCMM
PROJECTTrento
ACTIVITYFootbridge Tione Monitoring Systema
YEAR2009
CUSTOMERBacini Venezia
PROJECTVenice
ACTIVITYVenice Navy Yard Monitoring System
YEAR2009
CUSTOMERVipp
PROJECTChateau de Versailles
ACTIVITYMonitoring and alerting system
YEAR2009
CUSTOMERCattolica Scarl
PROJECTHistorical Tunnel Railway Cattolica
ACTIVITYMonitoring system
YEAR2008-2009
CUSTOMERGarbi-Linea 5 S.c.a.r.l.
PROJECTMilan Porta Garibaldi
ACTIVITYRail way monitoring system
YEAR2008-2009
CUSTOMERVeneranda Fabbrica del Duomo
PROJECTDome of Milan
ACTIVITYMonitoring system
YEAR2008-2009
CUSTOMERVipp Lavori
PROJECTMilan C.so XXII Marzo
ACTIVITYMonitoring system
YEAR2008
CUSTOMERSalini Costruttori
PROJECTBum Buna
ACTIVITYTechnical Assistance
YEAR2008
CUSTOMERRodano Consortile
PROJECTOasis Pegolotta
ACTIVITYRail way monitoring system
YEAR2007-2009
CUSTOMERGarboli
PROJECTNodo di Roma
ACTIVITYCivil structures and rail monitoring system of Line Nodo di Roma
YEAR2007
CUSTOMERAmiat
PROJECTTurin
ACTIVITYMonitoring of the settling
YEAR2003-2004
CUSTOMERGHAZI-BAROTHA
PROJECTGazi Barotha Power Plant-Pakistan
ACTIVITYSupply and Installation of monitoring instrumentation and Automatic Data Acquisition – Monitoring and Management Software
 
Field S.r.l. Via delle Rose, 7a | 24040 Lallio (Bg) | Tel +39.035.203471 | Fax +39.035.203448 | info@fieldsrl.it | posta certificata