italiano english
 
 
 
User Namewms
Password
 
FOLLOW USLinkedIn!Skype Me™!
 
  • 10-10-2015
  • 01-05-2015
    FIELD has achieved a Contract regarding Supply, Installation and Data Management (WMS) of the Geotechnical and Structural Monitoring System in the new High Speed Railways Torino-Lione - Lot Saint Martin La Porte
  • 01-04-2015
    FIELD has achieved a Contract regarding Supply and Installation of gauges, Topographical Activities, Drillings, Geotechnical and Geomechanical Investigation and Data Management (WMS) of the Višnové new highway tunnel (Slovakia)
  • 01-02-2015
    FIELD has achieved a Contract regarding SW Data Management (WMS) of the new Riyadh Line Package 3 Lines 4, 5 & 6 (KSA)
  • 01-01-2015
    FIELD has achieved a Contract relating to the supply, installation and data management with our WMS of a complex Static, dynamic and topographical monitoring system of 6 buildings adjacent to the workings site of the Bisagno River in Genova (Italy)
  • 30-09-2014
    Field acquire the contract, for the data management with WMS of the third Bosphorus Bridge, Istanbul
  • 01-09-2014
    Field acquired the contract, for design, supply, installation and data management (WMS) of railway platform monitoring system, with RDS and automatic Topographical stations in the construction site in Forlanini street (MI)
  • 11-07-2014
    Field performed Well Logs tests at the metro construction site in Riyadh - Saudi Arabia
  • 01-07-2014
    Field acquired the contract, for theperformance of tests PDI on the buildinsite LNG Project - Angola
  • 01-07-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the damOjo de Agua - Honduras
  • 28-04-2014
  • 15-04-2014
    Field performed Well Logs tests at the metro construction site in Doha-Qatar
  • 01-04-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the dam Cerro del Águila - Perù
  • 01-03-2014
    Field acquired the contract, concerning the supply and installation of instruments for walls monitoring and the execution of topographic control measurements at the building site of Porta Nuova Garibaldi Hotel-F (MI)
  • 10-01-2014
    Field acquired the contract, for the supply and installation of vibrating wire extensometers in the piles cages and the next load test for the building site of TEEM Lot B
  • 24-10-2013
    Field Srl contributed with their own systems of monitoring in the project to removal of the Costa Concordia
  • 01-10-2013
    Field has performed the tests of Viaducts 2, 2a, 3, 5.1, 5.2 and 6, and 2 of the Gallery of the new SS64 Porrettana
  • 01-08-2013
    Field acquired the contract, for the supply and installation of equipment for monitoring civilian works of the viaduct Serio and Oglio for the new High Speed ??- CEPAV 2
  • 01-08-2013
    Field acquired the contract, for the supply, installation and management of data instrumentation for structural monitoring of the new car park of St. Giusto - Trieste
  • 23-07-2013
  • 06-04-2013
    Field has acquired the contract for the supply and installation of geotechnical instrumentation for monitoring in the town of Acicastello (CT)
  • 03-04-2013
  • 21-02-2013
  • 21-02-2013
  • 14-02-2013
    Field is performing the installation of a control system for structural monitoring with manual and automatic reading system for the construction of the new underground car park on the harbor of Nice (France)
  • 14-01-2013
    Field has acquired the contract for the supply and installation of a system for remote monitoring data of dams Giacopiane - Pian Sapejo - Osiglietta
  • 01-11-2012
    Field participates through its monitoring systems and data management to recovery operations of the cruise ship Costa Concordia
  • 01-10-2012
    Field has acquired the contract for the execution of No.10 static load tests on the foundation piles for the new Mosque of Algiers-Algeria
  • 01-10-2012
    Field has acquired the contract for the supply, installation and management of data on our web portal WMS, inherent  the system of monitoring of the buildings adjacent to the Torrent Chiaravagna - Genoa
  • 01-07-2012
    Field acquired the contract for the execution of a system for elevation monitoring of the surface of the tract for the new line is MM5 - Milan
  • 01-03-2012
  • 01-03-2012
    Field acquired the contract, concerning the restoration and maintenance of the monitoring system of dam Castreccioni - Macerata
  • 01-02-2012
    Field acquired the contract, for the supply and installation of instrumentation for geological and structural monitoring including the data management with our system WMS of the Viaduct Fornace
  • 01-02-2012
    Field acquired the contract, for the design of monitoring system of the tracks of the Milan Metro Line 2, in the section between the stations Gessateand farm Antoinette.
  • 01-01-2012
    Field acquired the contract on, concerning the supply and installation of an automatic monitoring system at the viaduct "Micheletti 2"
  • 01-10-2011
    Consortium of Metro Line 1 of Panama, Field by the company owned Monitoriza S.A. has acquired the contract for the supply, installation, measurement and data management through our WMS of the new Line 1 of Panama City
  • 11-07-2011
    Field s through the company Monitoriza SA, acquired the order for Quimbo Dam (Colombia) for the design, supply and installation of geotechnical and structural instrumentation
  • 23-03-2011
  • 10-12-2010
    Field works with Impregilo for monitoring Hidrosogamoso dam (Colombia)
 
 
 
portfolio
YEAR2015
CUSTOMERSalini Impregilo
PROJECTNECKARTAL DAM PROJECT - ROLLER COMPACTED CONCRETE DAM
ACTIVITYDesign of geotechnical and structural monitoring system of Neckartal Dam - Namibia
YEAR2014
CUSTOMERConsorcio Riomantaro
PROJECTCerro del Aguila
ACTIVITYDesigning the control system and monitoring of the dam of Cerro del Aguila - Peru
YEAR2014
CUSTOMERSirtecnigi - Gazprom
PROJECTGas Treatment Plant - Kazatchiya - RUSSIA
ACTIVITYPiping stress monitoring system
YEAR2014
CUSTOMERGruppo Orquidea S.A.de C.v.
PROJECTOjo de Agua
ACTIVITYDesigning the control system and monitoring of the dam of Ojo de Agua - Honduras
YEAR2012
CUSTOMERCMB Società Cooperativa
PROJECTEXTERNAL EAST TANGENTIAL MILAN
ACTIVITYMonitoring system design of ungerground line 2
YEAR2011
CUSTOMERGRUPPO I.C.T. S.A.S.
PROJECTHydroelectric power station El Quimbo (Colombia)
ACTIVITYThe design monitoring system
YEAR2011
CUSTOMERGRUPPO I.C.T. S.A.S.
PROJECTHydroelectric power station on the river Sogamoso (Colombia)
ACTIVITYThe design monitoring system
YEAR2010
CUSTOMERAGT
PROJECTSochi-Russia
ACTIVITYDraftinf of specifications for the installation of monitoring system for landslide of Sochi
YEAR2010
CUSTOMERSnamprogetti
PROJECTCepav 2
ACTIVITYDrafting of guidelines for designing the monitoring system of the line AV Milano-Verona
YEAR2007-2009
CUSTOMERASG S.c.a.r.l.
PROJECTFS - AV High Speed Train Milan-Naples line - As-built
ACTIVITYWriting As-built Documents Lots 1.1, 1.2, 1.3, 1.4 e 2.1
YEAR2007-2008
CUSTOMERRODANO Consortile
PROJECTFS - AV High Speed Train Milan-Naples line - As-built
ACTIVITYWriting As-built Documents Lots 3.1 and 3.2
YEAR2007-2008
CUSTOMEREUROVIE S.c.a.r.l.
PROJECTFS - AV High Speed Train Milan-Naples line - As-built
ACTIVITYWriting As-built Documents Lot 2.3
YEAR2007
CUSTOMERSnamprogetti S.p.A.
PROJECTTap Monitoring System
ACTIVITYPlanning of the monitoring system of the Pipe Line Turkey
 
Field S.r.l. Via delle Rose, 7a | 24040 Lallio (Bg) | Tel +39.035.203471 | Fax +39.035.203448 | info@fieldsrl.it | posta certificata