italiano english
 
 
 
User Namewms
Password
 
FOLLOW USLinkedIn!Skype Me™!
 
  • 10-10-2015
  • 01-05-2015
    FIELD has achieved a Contract regarding Supply, Installation and Data Management (WMS) of the Geotechnical and Structural Monitoring System in the new High Speed Railways Torino-Lione - Lot Saint Martin La Porte
  • 01-04-2015
    FIELD has achieved a Contract regarding Supply and Installation of gauges, Topographical Activities, Drillings, Geotechnical and Geomechanical Investigation and Data Management (WMS) of the Višnové new highway tunnel (Slovakia)
  • 01-02-2015
    FIELD has achieved a Contract regarding SW Data Management (WMS) of the new Riyadh Line Package 3 Lines 4, 5 & 6 (KSA)
  • 01-01-2015
    FIELD has achieved a Contract relating to the supply, installation and data management with our WMS of a complex Static, dynamic and topographical monitoring system of 6 buildings adjacent to the workings site of the Bisagno River in Genova (Italy)
  • 30-09-2014
    Field acquire the contract, for the data management with WMS of the third Bosphorus Bridge, Istanbul
  • 01-09-2014
    Field acquired the contract, for design, supply, installation and data management (WMS) of railway platform monitoring system, with RDS and automatic Topographical stations in the construction site in Forlanini street (MI)
  • 11-07-2014
    Field performed Well Logs tests at the metro construction site in Riyadh - Saudi Arabia
  • 01-07-2014
    Field acquired the contract, for theperformance of tests PDI on the buildinsite LNG Project - Angola
  • 01-07-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the damOjo de Agua - Honduras
  • 28-04-2014
  • 15-04-2014
    Field performed Well Logs tests at the metro construction site in Doha-Qatar
  • 01-04-2014
    Field acquired the contract relating to the design, supply, installation and data management WMS of monitoring system of the dam Cerro del Águila - Perù
  • 01-03-2014
    Field acquired the contract, concerning the supply and installation of instruments for walls monitoring and the execution of topographic control measurements at the building site of Porta Nuova Garibaldi Hotel-F (MI)
  • 10-01-2014
    Field acquired the contract, for the supply and installation of vibrating wire extensometers in the piles cages and the next load test for the building site of TEEM Lot B
  • 24-10-2013
    Field Srl contributed with their own systems of monitoring in the project to removal of the Costa Concordia
  • 01-10-2013
    Field has performed the tests of Viaducts 2, 2a, 3, 5.1, 5.2 and 6, and 2 of the Gallery of the new SS64 Porrettana
  • 01-08-2013
    Field acquired the contract, for the supply and installation of equipment for monitoring civilian works of the viaduct Serio and Oglio for the new High Speed ??- CEPAV 2
  • 01-08-2013
    Field acquired the contract, for the supply, installation and management of data instrumentation for structural monitoring of the new car park of St. Giusto - Trieste
  • 23-07-2013
  • 06-04-2013
    Field has acquired the contract for the supply and installation of geotechnical instrumentation for monitoring in the town of Acicastello (CT)
  • 03-04-2013
  • 21-02-2013
  • 21-02-2013
  • 14-02-2013
    Field is performing the installation of a control system for structural monitoring with manual and automatic reading system for the construction of the new underground car park on the harbor of Nice (France)
  • 14-01-2013
    Field has acquired the contract for the supply and installation of a system for remote monitoring data of dams Giacopiane - Pian Sapejo - Osiglietta
  • 01-11-2012
    Field participates through its monitoring systems and data management to recovery operations of the cruise ship Costa Concordia
  • 01-10-2012
    Field has acquired the contract for the execution of No.10 static load tests on the foundation piles for the new Mosque of Algiers-Algeria
  • 01-10-2012
    Field has acquired the contract for the supply, installation and management of data on our web portal WMS, inherent  the system of monitoring of the buildings adjacent to the Torrent Chiaravagna - Genoa
  • 01-07-2012
    Field acquired the contract for the execution of a system for elevation monitoring of the surface of the tract for the new line is MM5 - Milan
  • 01-03-2012
  • 01-03-2012
    Field acquired the contract, concerning the restoration and maintenance of the monitoring system of dam Castreccioni - Macerata
  • 01-02-2012
    Field acquired the contract, for the supply and installation of instrumentation for geological and structural monitoring including the data management with our system WMS of the Viaduct Fornace
  • 01-02-2012
    Field acquired the contract, for the design of monitoring system of the tracks of the Milan Metro Line 2, in the section between the stations Gessateand farm Antoinette.
  • 01-01-2012
    Field acquired the contract on, concerning the supply and installation of an automatic monitoring system at the viaduct "Micheletti 2"
  • 01-10-2011
    Consortium of Metro Line 1 of Panama, Field by the company owned Monitoriza S.A. has acquired the contract for the supply, installation, measurement and data management through our WMS of the new Line 1 of Panama City
  • 11-07-2011
    Field s through the company Monitoriza SA, acquired the order for Quimbo Dam (Colombia) for the design, supply and installation of geotechnical and structural instrumentation
  • 23-03-2011
  • 10-12-2010
    Field works with Impregilo for monitoring Hidrosogamoso dam (Colombia)
 
 
 
Job Opportunities

FIELD Srl ricerca neolaureato in Ingegneria Informatica giovane, dinamico con propensione al lavoro in gruppo e disponibile anche ad eventuali trasferte all’estero da inserire nel proprio organico.

Requisiti: 

- laurea (anche triennale) in Ingegneria Informatica

- sviluppo Avanzato Ms Sql Server 2005/8/12/14
- sviluppo Wpf C# .Net
- sviluppo Xaml .Net
- sviluppo Windows Forms C# .Net
- sviluppo Web Html 5/Javascript
- generale conoscenza dei sistemi server Windows Server 2003/8/12
- buona conoscenza lingua inglese parlato e scritto
- titolo preferenziale la conoscenza della lingua spagnola
 
Se sei interessato, inviare C.V. e lettera di presentazione al seguente indirizzo mail: job@fieldsrl.it.






FIELD Srl ricerca, per l'ampliamento del proprio organico, Tecnici Specializzati in Sistemi di Monitoraggio geotecnico e stutturale, Prove in sito (provedi carico, cross-hole) e Monitoraggio Topografico ad alta precisione.

Requisiti specifici:

- dinamicità e intraprendenza;
- attitudine a lavorare in gruppo
- disponibilità a trasferte e/o trasferimenti in ambito nazionale ed internazionale;
- residenza e domicilio in zone limitrofe la Ns. sede di Bergamo.
- esperienza pluriannuale di cantiere in attività affini ai ruoli sopraindicati
- buona conoscenza lingua inglese parlato e scritto
- titolo preferenziale la conoscenza della lingua francese




Se sei interessato a lavorare con noi, puoi inviare il tuo Curriculum Vitae a job@fieldsrl.it

FIELD Srl garantisce che tutte le informazioni ricevute sono strettamente confidenziali e si impegna a proteggere la riservatezza dei dati personali dei propri utenti e di tutti coloro che rilasciano proprie informazioni alla Società, rispettando le regole imposte dal Decreto legislativo 30 giugno 2003, n. 196 (Codice in materia di protezione dei dati personali).

 
Field S.r.l. Via delle Rose, 7a | 24040 Lallio (Bg) | Tel +39.035.203471 | Fax +39.035.203448 | info@fieldsrl.it | posta certificata